The trough conveyer conveys the cooled clinker to the clinker storehouse, the conveying distance is 114m and the hoisting height is 45m. After putting into production, the gear ring of the driving sprocket device (for the whole body in less than one year's running time) Type) serious wear and tear, and the ring gear meshing with the chain, the separation is not good, so that when the device vibration larger; other fixed gear ring bolts frequently loose, often need to stop fastening or replacement. October 2003 Replacement of component ring gear with five equal parts, supplied by equipment supplier, less than 3 months after on-site installation, severe wear on ring gear, frequent bolt looseness. Analyzed, resulting in serious wear and tear ring gear, bolts are often loosened the main reasons: the site installation space is small, poor assembly, resulting in split ring gear force uneven; overload operation; only installed in the tail of the drip tank on the chain Lubrication, ignoring the active gear ring and chain meshing Department of lubrication; environmental dust, chain adhesion dust and more; ring gear operating temperature is high, so that the tension of the bolt is not enough.It's good for the running of trough belt conveyor.
In response to the above situation, we took targeted measures in March 2004: self-mapping, design, production of integral ring gear and prior assembly in the workshop, making a set of active sprocket device and the use of the overall replacement of temporary stop to ensure The ring gear force uniform, so that it meets the assembly requirements; In the active gear ring and chain meshing Department added a lubricating oil pump, according to the operation at regular intervals to start the oil pump will be injected into the ring gear and the gear meshing Department, ensuring that Gear ring and the chain meshing parts of the normal lubrication; the ring gear and the wheel fixed bolts replaced by high strength bolts and heated to 801, make full use of the principle of thermal expansion and contraction, increasing its tension to prevent loosening; in the chain Every 20m made with the old belt slightly smaller than the width of the chain U-shaped clip, fixed in the rack to clean the chain of dust; strengthen kiln system operation, improve clinker cooling effect, and reduce the number of overload equipment.It's good for the running of trough belt conveyor.
