Installation and Commissioning of Mine Belt Conveyor is very important.Commissioning should be done without trial run conveyor Conveyor conveyor belt runaway adjustment and conveyor belt adjustment work in the production of coal mine, belt conveyor is widely used, is a coal mine continuous transport equipment, its installation and commissioning How the effect directly affects its use. It is good for rubber disc return roller manufacturers.Conveyor before installation in the underground should first check whether the various parts intact, the number of species is complete, otherwise it should be repaired in the well ready.
Installation of belt conveyor is very important. Preparation for Installation Before installation, the installer must be familiar with the equipment and related paper information. According to the mine handling conditions, determine the maximum size and quality of equipment components. In the installation of the roadway equipment, first determine the conveyor Ayan centerline and the installation position of the nose, the woo Cong point in the top and bottom of the corresponding position on the logo. According to the length of the fixed installation part marked by the overall assembly of the equipment, the floor of the roadway shall be flattened out, and the roadway of the fuselage which is mainly used for fixing the non-fixed part to the floor frame shall also be required to be generally smooth. It is good for rubber disc return roller manufacturers. In order to facilitate the transport, the machine will be disassembled in the larger part of the demolition equipment said should be so good equipment in order to pay attention to the installation of packaging to avoid possible handling parts may bump injury or into the dust, for exposed gear bearings As well as processing mating surfaces, must take measures to be protected.Downhole laying to avoid roadway blockage. Should be in accordance with the principle of first aid. That is, according to the end of the tail movement tail machine body idler under the roller tape storage device storage bin package tensioning car swimming small first-class nose gear and so on order to move to the door of the installation point of the roadway.According to the benchmark has been established, first install the fixed parts, such as machine head storage warehouse tail and other parts. After installation, the machine tail and the center line of the drum should be in the same line, the level of the drum axis to allow the material to be used to achieve the best pressure amplitude of the rolling speed for fighting some countries research pointed out, such as France, France vibration frequency Should be higher in order to obtain a good road traffic quality, in any case, the frequency value of not less than 33 hertz; thin layer of material or less easily mixed with a frequency of 4050 Hz. Good workability Puddle Mixture with an amplitude of 0.30.51 and a Hardness Mixture of 0.8 can not be rolled excessively. Cracking may occur if the thin layer 2.541 is too much or compacted. Vibration compaction parameters recommended by World Roads may be used as a reference.